INFORMATION on the work done by the North Kazakhstan branch of RSE “Kazvodkhoz”

On a production site “Sergeevsky hydro unit” the planned and preventive works were carried out according to the schedule of “Organization of preventive maintenance of electrical equipment” for 2018:

–  repair of video surveillance system at guard post number 2;

– Revision of outdoor lighting with the replacement of the LED lamp in order to illuminate the downstream.

Overhaul of the outlet channel of the building of hydroelectric power station:

– an inert material, gravel for the planning of the roadway were brought;

– Barbed wire fencing on the left bank of the lower pool is underway.

Repair of tractor equipment, namely the MTZ-82 tractor gearbox was carried out.

At the production site “Sergeevsky hydrosystem”, a light advertisement was installed “Sergeevka su toraby, Sergeevsky hydro unit».

The works on concreting pits on the roadway of the road bridge – 1.0 m2. were performed.

        On an ongoing basis, the territory of the hydro unit’s security zones is being cleaned with garbage collection at the landfill.

 

On a production site “Petropavlovsky hydro unit” the planned and preventive works were carried out according to the schedule of “Organization of preventive maintenance of electrical equipment” for 2018.

– Revision of the outdoor lighting network – replacement of DNaT-250 lamps and starters;

– CCTV cameras have been checked.

On the production base it has been replaced the power supply unit of the heat supply system of garages and auxiliary premises..

A light advertisement “Petropavl Su Tauraby, Petropavlovsk Hydro Unit” was installed at the production site “Petropavlovsk Hydro Unit”.

         On an ongoing basis, cleaning of security zones of a hydraulic facility is being carried out.